CASO
NARHF
CASO Volunteers
Railway Capital of Canada
CASO banner
Donate Now
Our Station's Future
The Restoration
Station History
Station Timeline
Our Partners
Local Rail Connections
Hall of Fame Inductions
Board of Directors
Upcoming Events
Employment
Gift Shop
Tours
Media Releases
Frequent Questions
Online Brochures
Photo Gallery

© 2008 All content-unless otherwise noted: North America Railway Hall of Fame, P.O. Box 20040 St.Thomas, Ontario N5P 4H4
Phone: 519-633-2535 Fax: 519-633-3087 Donation Hotline: 519-633-3934

The Connaught Tunnel
Facilities and Structures


The Connaught Tunnel, built between 1913 and 1916, is 5.02 miles long. At the time, it was the longest tunnel in Canada. The Tunnel was opened on December 16, 1916. Prior to construction of the Connaught Tunnel, the Canadian Pacific mainline twisted around the base of the mountains through Rogers Pass.

The tunnel is 20 feet wide, cement-lined and named for the Duke of Connaught, who was Governor-General of Canada. Construction of the tunnel eliminated 200 degrees of curves, clipped 4.52 miles off the transcontinental mileage and reduced hazards due to a 30-foot average yearly snowfalls. There were some problems at first, such as inadequate ventilation, wet rails causing wheels to slip and dangerous loose rocks. The original dual track was reduced to a single track to increase clearance and make maintenance easier and safer. The Connaught Tunnel contributed to development of the railway as a more reliable east to west transportation link which could be used throughout the year.

Read more about The Connaught Tunnel [offsite]